플랑크 비전 시스템 플랜크 비전 시스템은 다음을 포함한 상업용 애플리케이션의 휴대용 검사 및 연중무휴 모니터링을 위한 열화상 솔루션을 제조합니다: 조기 화재 감지, 제조, 변전소 및 터널, 전기 패널/캐비닛, 저장 시설, 데이터 센터 및 체온 상승 검사 등 다양한 분야에서 활용되고 있습니다. 저희 회사는 미국 적외선 감지 기술의 중심지인 캘리포니아주 산타바바라에 본사를 두고 있습니다.
On January 6, 2025, a scrub fire in the Whakamārama area near Te Puna Stream caused significant traffic delays on State Highway 2, with delays reaching up to two hours. The fire, reported at 1:48 pm, was near the bridge between Barrett Road and Te Karaka Drive. Over 200 properties were affected by power outages, with PowerCo expecting restoration by 6 pm. Initial estimates indicate damages around $500,000, with multiple fire crews responding to the incident.

뉴스
On January 6, 2025, a significant scrub fire broke out near Te Puna Stream in the Whakamārama area, located on State Highway 2 (SH2), severely disrupting traffic and local power supplies. The fire, reported to Fire and Emergency New Zealand at 1:48 pm, was situated near the bridge between Barrett Road and Te Karaka Drive on SH2. Due to the fire, traffic was reduced to one lane, causing delays of up to two hours, particularly affecting motorists traveling south from Waihī and north from Te Puna.
The fire, which was attended by fire crews from Ōmokoroa, Greerton, Katikati, Tauranga, Waihi, and Te Puke, was brought under control by around 4:20 pm, but traffic congestion persisted. Nine fire crews responded, and three remained on-site to dampen the area. The fire’s cause is still under investigation, but it is believed to be a scrub fire, which is particularly difficult to control given the dry conditions in the region.
In addition to the traffic disruptions, PowerCo reported power outages affecting over 200 properties in the Whakamārama area, with power cuts at 1:47 pm and 1:53 pm. The outages were expected to be resolved by 6 pm, once PowerCo’s teams completed their repairs. Initial damage assessments suggest that the fire caused a loss of approximately $500,000, including damage to local infrastructure and potential property damages.
As the fire was extinguished, NZTA Waka Kotahi advised motorists to consider alternative routes or delay their travel plans. For northbound travelers, a detour route via SH29 over the Kaimai Range and continuing on SH24, SH27, and SH26 before rejoining SH2 was recommended. The southbound detour followed the reverse path.
This incident highlights the importance of early fire detection and rapid response to avoid larger-scale disruptions. Utilizing advanced thermal imaging systems, such as the TRX600 robotic system from Planck Vision Systems, can help detect such fires earlier, preventing significant traffic and property damages.
With the TRX600’s ability to monitor hard-to-reach areas and provide real-time data, it enables timely interventions that reduce risks and prevent long-term safety concerns. Early detection, like that provided by the TRX600 system, could have mitigated the spread of this fire, ensuring the safety of local communities and minimizing economic losses.
출처: sunlive.co.nz
조기 화재 감지를 위한 확장 가능한 솔루션
화재 조기 감지용, 플랑크 비전 TNC 열화상 카메라 는 연기와 화염의 가시적 결과가 나타난 후에야 화재를 경고할 수 있는 기존 시스템보다 훨씬 우수합니다. TNC 카메라는 화재가 발생하기 전에 비정상적인 열 상태를 감시하여 물품의 파괴와 인명 손실을 방지하는 데 도움을 줄 수 있습니다.
6가지 장점 플랑크 비전 열화상 카메라:
업계 최고의 감도: 소니 카메라는 위험한 화염 전 상태와 화염 후 핫스팟을 쉽게 식별하여 광범위한 피해를 예방할 수 있도록 조기 경고를 제공합니다.
사용자 지정 가능한 옵션: 소니는 다양한 센서 해상도 및 렌즈 광학 기술을 통해 특정 감시 요구 사항에 맞게 카메라를 맞춤 제작하여 모든 애플리케이션에 최적의 성능을 보장합니다.
듀얼 열화상/실화상 카메라: 열상 카메라와 실화상 카메라를 하나의 장치에 결합하면 상황 인식이 향상되어 포괄적인 모니터링과 잠재적 위협에 대한 신속한 대응이 가능합니다.
간편한 설치 및 작동: 소니의 IP 카메라는 로컬 네트워크에 원활하게 통합되도록 설계되어 설치와 운영을 간소화하여 효율성을 높입니다.
사용자 프로그래밍 분석: Edge에서 실행되는 분석을 통해 최고의 안정성을 제공하며, 사용자가 정확한 위협 탐지를 위해 모니터링 매개변수를 사용자 지정할 수 있도록 지원합니다.
온카메라 헤드 릴레이: 온카메라 헤드 릴레이를 통해 가장 필요한 곳에 컨트롤을 배치하여 중요한 상황에서 빠르게 조정하고 개입할 수 있습니다.






